Thank you for your interest to view the below mentioned tender. If you want to view further details, download available tender documents, require bidding support, class 3 digital signature certificate, signing and encryption, vendor registration support and much more, click Download Tender Document link.

Basic tender information about # 16789006

Works Are Identified And Specified By Reference To The Ghd Design Documents In The Request Documents. The Major Elements Of The Fit Out Include: A Architecture I. Construction Of Data Processing Equipment Rooms Ii. Construction Of Console Rooms With Flooded Floor Plenum Iii. Construct Training Rooms Iv. Construct A Video Conference Room V. Construct Meeting Rooms Vi. Construct Open Plan Office Workspace Vii. Construct Testing Workstations Area Viii. Demolition Works As Shows On The Drawings Ix. Construct Partitioning To Suit Zone 2 And Zone 3 Security Areas, Including Supply And Installation Of New Hardware And Access Controls, Including The Addition Of Structural Silicon To The Internal Face Of Existing Glazing B Electrical I. Supply And Installation Of Exposed Services And Cable Trays Ii. Decommission, Demolition, Disposal Off Site Of The Redundant Electrical And Communications Services As Identified Iii. The Supply, Installation, Testing, Commissioning, Maintenance And Warranty Of The Electrical And Communications Services As Identified C Mechanical I. Decommission, Demolition, Disposal Off Site Of The Redundant Mechanical Services As Identified Ii. The Supply, Installation, Testing, Commissioning, Maintenance And Warranty Of The Mechanical Services As Identified D Fire I. Carry Out Hydraulic Calculation To Determine The Maximum Flow And Pressure Requirement Of The Sprinkler System Within The Project Refurbishment Area. Ii. Allow To Upgrade Fire Sprinkler Pumps And Reconnect The Existing Pipes To The Upgraded Fire Sprinkler Pumps. The Pump Duty Shall Be Based On The Above Hydraulic Calculation. Iii. Reroute The Existing Supply Main To The Roof And Reconnect To The Existing Sprinkler Main. Iv. Replace The Ex Air-Compressor With A New One For The Pre-Action Sprinkler System. V. Alter Existing Sprinkler System As Shown On The Drawings. Vi. Provide Metal Guard To Ceiling Space And Underfloor Space Sprinklers In Jssf Racks, Jssf & Sps Consoles And Asts Room. Vii. New Sprinklers And Pipes In Gas Bottle Storage Room. Viii. Supply And Install New Monitored Isolating Valves To Enable Zone Isolation. Ix. Supply And Install Drain Valve To Underfloor Sprinkler Pipes. The Fit Out Works Exclude: A Provision And Installation Of New Data Processing Equipment B Provision And Installation Of The Consoles, Workstations And Furniture Items C Communications Cabling Between The Equipment Rooms And The Consoles And The Testing Workstations.

Download Document

Related Information

Location

Australia - Australia, Australia

Tender No

-

Tender Type

Contract

Important Dates

Published on

16 Oct, 2019

Submission Date

31 Oct, 2019

Opening Date

31 Oct, 2019

Key Values

Work Value

NA

EMD

NA

Document Fee

NA